On this job the customer has a bath and no longer wanted it as he has trouble getting in out of the bath as he is now disabled so we removed everything out.
When removing the tiles the walls were badly damaged the plaster behind so all the walls had to be re-plastered.
before that I put chases in the walls for the pipe work in the shower area, I needed extra chases as I was fitting a digital shower with a remote control so that customers wife could adjust the temperature for him if need be.
We built a stud wall to fit a shower seat to so that he can sit down, fully tiled the room and fitted grab rails to help him to sit down and get up,a non-slip floor and a free standing radiator.